You are here: Home

 

Project In Singapore

Public Works Department (Attn: Mr. Wong Khuan Woon )

Pasir Ris Park -
Sandy Beach Extension
Feasibility Study
- $18 million

Changi North Beach
- Feasibility Study - $5 million

Tuas Jetty Feasibility Study
- $10 million

Principal  Consultant
Public Utilities Board (Attn:Mr Foo Kheong Kee)

Senoko Power Station Tanker Jetty - $6

Repair to Existing Jetty Senoko Power Station - $0.3 million

Principal Consultant
Ministry of the Environment

Breakwater @ Changi South Drain - $1 million
Leachate Treatment Plant Tampines - $5 million

Serangoon South New Town
Drainage Scheme - Contract 2 - $6.5 million

Civil  Engineer  (Principal Consultant: Grabowsky & Port of the Netherlands)
Civil Engineer (Turn-key Contractor :Koon Construction& : Transport Co Pte L td

Jurong Town Corporation

Beach Erosion Assessment & Repair @ Kusu Island,
St John’s Island & P Renget - $5 million

Ministry of National Development
* Simpang Development Guide Plan

Civil Engineer  (Principal Consultant: Jurong Environmental Pte Ltd
Civil Engineer (Principal Consultant: OD Architects
Ministry  of  Defence
Infrastructural  Development - $ 4.5  million Principal  Consultant
Shell Eastern Petroleum Pte.Ltd. Pulau Bukom
( Maintenance of existing facilities and design of tanks, pipe racks,
support, pump and exchanger  foundation etc )
Civil and Structural Engineer ( In House Engagement )

 

[ BACK ]